Search This Blog

Sunday, July 27, 2014

Day 119

It is almost livable!!
 
I mean, except for the lack of toilets, but in the grand scheme of things.....
 
So here is how it looks:
 
Downstairs is all cleaned up....just needs carpet!
 
Tile breezeway between the patio and Adam's garage door downstairs: 
 
Dining room ceilings are all finished up and the light fixture is up:
 
Living room all painted and *almost* all cleaned up.  Just needs a few details! 
 
Grass was laid in the back!  The yard looks HUGE with all the grass in back there! 
 
Garage door openers are in.  This one is in Adam's garage downstairs.....no pipes or insulation in my garage upstairs! 
 
Bedroom upstairs is all done, except for carpet: 
 
Bonus room upstairs....lights are in and working! 
 
Tile shower upstairs....looks luxurious! 
 
Upstairs bathroom....minus a toilet.  Details, details..... 
 
Hallway upstairs between the bonus room and bedroom.  Everything up on this level is ready to go as soon as carpet comes! 
 
Stairway lighting going up to the third floor.....LOVE it! 
 
Unfinished space downstairs.....this is the only space that I wish didn't have a light that works!  Now I can turn it on and see the mess of wood Adam has been piling up to build storage shelves.  Next week, he has a project!! 
 
The kid's bathroom downstairs hasn't been tiled yet, but that is supposed to be happening tomorrow! 
 
 
Literally everything except carpet is supposed to be finished up by the next weekend! 
Stay tuned....many changes going on in upcoming days! 
 
11 days to go.....

No comments:

Post a Comment